Jackson Freestanding ED, GalianoCoral Gables, FL

Concrete & masonry takeoff, 2-story healthcare building

Project overview

Concrete and masonry takeoff and estimate for the two-story, 11,573 SF Jackson Freestanding Emergency Department at Galiano in Coral Gables, Florida. The scope covered foundations, the cast-in-place column, beam and slab frame through the clerestory roof, reinforced CMU walls and site concrete. Rebar was broken out by bar size and rolled up into a material order summary the contractor could send straight to suppliers.

Scope of the estimate

  • Spread and continuous footings, with rebar and formwork by footing type
  • Cast-in-place columns, beams and slabs for both floors and the clerestory roof
  • Reinforced CMU walls, cell grout, and concrete window headers and sills
  • Site concrete: sidewalks, curbs, equipment pads, trash enclosure and site footings

Project files

Open the actual deliverables for this project and judge the level of detail yourself.